10-05-2021, 09:56 AM | #1 |
Captain
1162
Rep 714
Posts |
Let’s figure this out
So I’ve been reading a lot of these threads and keeping sort of a mental note as to who is delayed and why and from my “research” it appears that anybody who has the carbon bucket seats AND were originally a week 38 or later build week are the ones being delayed. For those of you who are actually IN production or already produced, can you verify if your car has carbon buckets and was delayed at all? And for those who are being pushed, can you verify if you have carbon bucket seats as an option?
And to clarify, this is only pertaining to the actual factory building/build week delays, not the stop sales or post factory delays. Let’s see if we can figure out what’s really causing this cause heaven knows BMW isn’t ever going to tell us anything. |
10-05-2021, 10:00 AM | #2 | |
Captain
1307
Rep 957
Posts |
Quote:
__________________
[/SIGPIC]
|
|
Appreciate
0
|
10-05-2021, 10:08 AM | #4 |
Captain
1162
Rep 714
Posts |
|
Appreciate
0
|
10-05-2021, 10:18 AM | #5 |
Major
731
Rep 1,250
Posts |
I was originally a week 35 build. Got pushed back 5 times to week 40. No carbon seats. G82 Xdrive, BSM, exec, park assist, drivers assist, laser lights, ventilated seats. I’m finally in paint booth w est. 10/7 completion. We’ll see if any stop sales… if you can make sense of all this more power to you.
|
Appreciate
1
Limegrntaln13699.50 |
10-05-2021, 10:28 AM | #6 |
Captain
616
Rep 824
Posts
Drives: G80 M3CX (Oxide Grey)
Join Date: Nov 2014
Location: Glasgow, UK
|
Originally Week 36 pushed back to Week 40, finally went Production begins 10/01 with estimated completion 10/08.
No carbon seats either... G80 xDrive, Oxide Grey, Full Black Leather, Carbon Exterior, Carbon Interior Trim, Extended Shadowline Trim, Laserlights, M Shadowline Lights, Parking Assistance, Drive Recorder, 360 Surround View, Comfort Access, HUD, Gesture Control
__________________
Gone:
2011 E90 318d (Alpine White) • 2016 F83 M4 (Mineral White) • 2019 F83 M4 Competition (Sapphire Black) Current: 2022 G80 M3 Competition M xDrive (Oxide Grey) |
Appreciate
0
|
10-05-2021, 11:03 AM | #7 |
Captain
341
Rep 655
Posts |
order placed on august 14th, received allocation on the 28th, been in status 111 for the month. genius said i am scheduled for production week 43. i am now status 112. i check probably 2-3 times a day, it hasn't changed as far as I can tell, ie. at this point my scheduled production week hasn't changed and my status has been steady and not going back and forth.
Frozen Brilliant White Fiona Red (Full) Executive/Drivers Assistance/Parking Packages Carbon Fiber trim Icon Adaptive LED w/Laserlight M Carbon Exterior Package M Drive Professional M Shadowline Lights M carbon bucket seats |
Appreciate
0
|
10-05-2021, 11:12 AM | #8 |
Captain
1162
Rep 714
Posts |
So maybe the original reason it seems for builds pre week 40 being delayed were the laser lights but now it is the buckets. Or at least in the cases noted so far. Anyone else chime in! It’s possible I’m still wrong but the more data we have and the more minds we have thinking the better our chances to figure this out.
|
Appreciate
0
|
10-05-2021, 11:57 AM | #9 |
Second Lieutenant
285
Rep 244
Posts |
I was originally week 42 at time of order and everything has stayed true to schedule and I went into production last night.
2022 M3C RWD Frozen White Exec Package Parking Assistance Carbon interior trim ventilated seats shadowline headlights |
Appreciate
0
|
10-05-2021, 12:06 PM | #10 |
Major General
13700
Rep 7,030
Posts
Drives: 2022 DG/BLk xDrive M4C Wk 34
Join Date: Mar 2008
Location: Sacramento Area
|
I ordered my car on 7/14. Allocation was already in 112 status, I just needed to spec the car. I went down to spec the car, and by the time I got home and created a BMWUSA account, and entered in the production number, the car was accepted for Production. 7/29 I went into 150 status, assigned a VIN, and sat at 150 status until 8/24, where my car breezed through assembly and production, and was at Bremerhaven, 500 miles from the factory, by 8/28. Sat in Bremerhaven until 9/8. and is now supposed to land at Port Hueneme, tomorrow, only to be held up by a STOP SALE, for RAM (Receiver Audio Module). ETA to delivery, unknown. Build Week 34
__________________
2022 DravitGrau /Black Full Merino M4 Competition M xDrive / Production Week 34/ Delivered 10/19/21/ IG: dravit_m4_comp
YT: G Dubyou Last edited by Limegrntaln; 10-05-2021 at 12:11 PM.. |
Appreciate
0
|
10-05-2021, 12:10 PM | #11 |
BimmerPost Supporting Vendor
10873
Rep 27,644
Posts |
variables are always changing almost impossible to figure out exact right now.
__________________
BEFORE YOU BUY YOUR NEXT BMW, EMAIL OUR GUY KOTE FIRST! Kote M Sales:Kotem@bmwofcamarillo.com Cell:805-368-9101 vipfinance@bmwofcamarillo.com for warranties! |
Appreciate
0
|
10-05-2021, 01:27 PM | #12 |
Major General
19312
Rep 8,109
Posts
Drives: 2024 X5 M60i
Join Date: Feb 2011
Location: Phoenix
|
Obtained production number on 7/13 and originally scheduled for week 35. Got bumped to week 39 and arrived at the Bremerhaven port as of today.
Build is as follows: M3 Competition Twilight Purple Silverstone/Black Full Merino Leather Parking Assistance Package Executive Package M Drive Professional 19"/20" M Double-Spoke Black Wheels, Style 826M, w/Performance Non-Run Flat Tires M Compound Brakes with Red Calipers M Shadowline Lights Carbon Fiber Trim Icon Adaptive LED Headlights with Laserlight M Carbon Bucket Seats M Carbon Exterior Package
__________________
Instagram: @Phxrisingphotography
Current - 2024 G05 X5 ///M60i in Java Green Past - 2005 E53 X5 3.0i in Titanium Silver; 2008 E92 335i in Montego Blue; 2019 G01 X3 M40i in Glacier Silver; 2022 G80 M3 Competition in Twilight Purple |
Appreciate
0
|
10-05-2021, 01:40 PM | #13 |
Private First Class
257
Rep 148
Posts |
'Quality check' since 9/30
Ordered 7/5 Changed Color to Indiv. - 7/8 Indiv Accepted - 7/13 Genius reported Week 36 - 7/26 Genius reported Week 39 - 8/11 Scheduled for Production - 9/2 Production Begins - 9/14 Exterior Body Assembly - 9/24 Paint Booth - 9/24 Entering Assembly Line - 9/29 Assembly In Progress - 9/29 Quality check - 9/30 Est. completion per Genius on 9/30 - 9/30; Called today and no new info. 10/5 |
Appreciate
0
|
10-05-2021, 03:06 PM | #14 |
Second Lieutenant
97
Rep 239
Posts |
Build week 36, completed production 9/17.
Been sitting in quality check since then. No carbon buckets. But did have Exec., Parking assist, driving assist. |
Appreciate
0
|
10-05-2021, 04:38 PM | #15 |
Captain
1162
Rep 714
Posts |
So my theory of builds prior to week 39 staying on target seems to be mostly true regardless of options. Anybody after week 39 seem to have no holdups as long as no carbon buckets or laser lights were specd. Anybody post week 39 have any input?
|
Appreciate
0
|
10-05-2021, 05:20 PM | #16 |
Private First Class
99
Rep 180
Posts |
|
Appreciate
0
|
10-05-2021, 08:37 PM | #17 |
Lieutenant Colonel
3245
Rep 1,661
Posts |
Challenging your latest theory (but kudos to you for trying!) .. received allocation on August 26 for Week 40, and released from factory this morning and at port this afternoon (Tuesday of Week 40). Options include Executive and Driving Assistance packages, laserlights and a few minor things. Options exclude carbon bucket seats and Parking Assistance.
|
Appreciate
0
|
10-05-2021, 09:07 PM | #18 |
First Lieutenant
189
Rep 300
Posts |
I've been trying to figure this out as well to no avail but support the cause.
G82 comp Brooklyn grey Executive package Parking assistance Driver assistance pro Laser lights Ventilated seats Moonroof Car fiber trim and exterior package M shadowline lights 826M wheels Non carbon fiber seats Adding my full production schedule in case that helps the cause. 5/24 Order placed Early June, allocation number provided and order received via the tracker on my genius Week 29 build 7/7 production begins 7/16 exterior body assembly begins, in the paint booth 7/21 entering assembly line, assembly in progress 7/22 quality check 9/27 final assembly, awaiting carrier assignment, dispatched from factory 9/28 at the port 10/4 call from SA that it was in transit 10/5 my genius showed in transit |
Appreciate
0
|
10-05-2021, 09:54 PM | #19 | |
Captain
1162
Rep 714
Posts |
Quote:
|
|
Appreciate
0
|
10-05-2021, 09:55 PM | #20 | |
Captain
1162
Rep 714
Posts |
Quote:
|
|
Appreciate
0
|
10-05-2021, 10:20 PM | #21 | ||
First Lieutenant
189
Rep 300
Posts |
Quote:
|
||
Appreciate
0
|
10-06-2021, 12:01 AM | #22 | |||
Private
106
Rep 97
Posts |
Quote:
__________________
2022 AWD G80 M3 Comp | Week 29 Build | BSM w/ Fiona Red |
|||
Appreciate
1
Tdubb88188.50 |
Post Reply |
Bookmarks |
Tags |
build week, delay, parts shortage |
|
|